Bore Project

Lake Chelan

Difficulties are where Allied shines. We completed this bore project on the lakefront. Even with limited access points and difficult ground to work in we were up for the challenge and ended with a great result for the customer.

Other Projects

400' x 42” Pipe with Bend under Water Level

Lining this 42” stormwater pipe offered unique challenges.

Remote Culverts in National Park

This project was located in the Olympic National Park requiring the lining of culverts on hillsides with remote access.

60-degree Slope Pipe Rehabilitation

This project consisted of the rehabilitation of a pipe with over a 60-degree slope.